Project Information
📍 Location: Lot A1-2, Area A1, D4 Street, Tan Phu Trung Industrial Park, Tram Bom Hamlet, Tan Phu Trung Ward, Cu Chi District, Ho Chi Minh City, Vietnam
📐 Scale: A synchronized industrial complex featuring permanent pre-engineered heavy steel structures designed to meet clean and safe modern manufacturing standards
🎨 Investor: Gia Thy Investment Joint Stock Company
⏱️ Time of execution: 11 mouths
📋 Implementation stages:
- ✔️ Stage 1: Dossier for fire safety design approval.
- ✔️ Stage 2: Rough installation (fire alarm wiring, emergency exit lights, fire-fighting piping, and lightning protection grounding pits).
- ✔️ Stage 3: Complete equipment installation. Technical acceptance.
- ✔️ Stage 4: Fire safety acceptance and licensing; Handover, operational guidance, and commissioning of the facility.
Here is the English description for the Iron and Wood Processing Workshop Project of Gia Thy Construction Joint Stock Company in Cu Chi District, Ho Chi Minh City:
Project Title: The Industrial Infrastructure and Manufacturing Plant of Gia Thy Investment Joint Stock Company (Iron and Wood Processing Workshops)
1. General Information & Strategic Location
-
- Location: Lot A1-2, Area A1, D4 Street, Tan Phu Trung Industrial Park, Tram Bom Hamlet, Tan Phu Trung Ward, Cu Chi District, Ho Chi Minh City, Vietnam.
- Developer / Investor: Gia Thy Investment Joint Stock Company (formerly known as Gia Thy Construction Joint Stock Company).
- Project Timeline: Groundbreaking took place on October 14, 2019, and the facility was officially completed and put into dynamic industrial operations in September 2020.
2. Project Scale & Total Investment Capital
-
- Total Investment Budget: 140,251,740,038 VND (Over 140 billion VND allocated for factory construction, structural fabrication, and next-generation production machinery lines).
- Structural Classification: A synchronized industrial complex featuring permanent pre-engineered heavy steel structures designed to meet clean and safe modern manufacturing standards.
3. Functional Subdivisions & Operational Capacity
The factory floor layout is systematically divided into two specialized, enclosed industrial processing zones to streamline the company’s internal supply chain:
-
- The Iron Processing Workshop (Mechanical & Structural Steel): Specialized in the manufacturing, precision machining, and assembly of metal formworks, pre-engineered structural steel framing components, and structural hardware used directly in large-scale civil and industrial projects contracted by Gia Thy.
- The Wood Processing Workshop (Furniture Manufacturing): Outfitted with heavy-duty CNC machinery, wood-cutting systems, and advanced surface treatment lines. This zone produces premium natural and industrial wooden furniture modules for corporate offices, high-end schools, and residential apartments.
- Auxiliary Technical Infrastructure: Includes a multi-storey factory administration building, standard climate-controlled raw material warehouses, heavy-vehicle loading bays, an eco-compliant industrial waste processing facility, and a certified automated fire fighting and prevention network.
