Project Information
📍 Location: No. 504/58C Kinh Duong Vuong Street, An Lac Ward, Binh Tan District, Ho Chi Minh City, Vietnam
📐 Scale: Group B
🎨 Investor: The Construction Investment Management Board of Tan Phu District
⏱️ Time of execution: 18 mouths
📋 Implementation stages:
- ✔️ Stage 1: Dossier for fire safety design approval.
- ✔️ Stage 2: Rough installation (fire alarm wiring, emergency exit lights, fire-fighting piping, and lightning protection grounding pits).
- ✔️ Stage 3: Complete equipment installation. Technical acceptance.
- ✔️ Stage 4: Fire safety acceptance and licensing; Handover, operational guidance, and commissioning of the facility.
The An Lac 3 Primary School Project in Binh Tan District, Ho Chi Minh City:
Project Title: The Expansion and Development Project of An Lac 3 Primary School
1. General Information & Location
-
- Location: No. 504/58C Kinh Duong Vuong Street, An Lac Ward, Binh Tan District, Ho Chi Minh City, Vietnam.
- Primary Managing Authority: The Investment and Construction Project Management Board of Binh Tan District.
- Project Classification: Group B Public Infrastructure Project.
- Development Objective: Developed systematically to meet National Quality Standard Level 2 benchmarks and align with advanced, globally integrated primary education frameworks.
2. Existing Scale & Functional Subdivisions
Following rigorous structural modernization phases, the school campus boasts a highly functional layout:
-
- Classroom Framework: Features more than 30 standardized academic classrooms tailored for full-day and day-boarding schooling schedules. It actively supports specialized advanced integrated English curricula.
- Specialized Learning Zones: Fully equipped with next-generation specialized rooms, including dedicated audio-visual rooms, music studios, and modern computer labs.
- Day-boarding Infrastructure: Integrated with secure, hygienic day-boarding resting zones, a central cafeteria, administrative wings for school executives, and a standard library facility.
3. Expansion Project Scale (Latest Phase)
To ease the increasing demand for primary education caused by rapid local population growth, the Binh Tan District People’s Committee approved a major expansion phase:
- Total Investment Budget (Expansion): Approximately 39.3 billion VND (specifically 39,289,500,478 VND) allocated for construction, structural finishing, and new equipment procurement.
- Expansion Work Scope: Construction of supplementary multi-story classroom blocks, playground and landscape remodeling, upgrading the internal drainage network, and installing a certified fire fighting and prevention (FFP) system seamlessly connected with the existing structure.